Tower # 3 was put back into use today. Installed the repainted brackets, installed new aluminum mast section (6m 50MM tube 5mm wall).
And finally the 2m yagi!
First time raised, with just the LMR400 UltraFlex tails.
Finished with the LDF4-50 hardline runs completed.
No comments:
Post a Comment